Predmetom dražby sú nasledujúce nehnuteľnosti so všetkými ich súčasťami a príslušenstvom: - house register number 392 with facilities built on plot. No. 7230/1 pozemok the logs "C" on Parcel č. 7230/1, in the. O. Čadca, District Čadca, entered the LV No. 12996, the share of ownership 1/1.
House is built in the street sealing, in the city of Podzávoz district town of Trutnov. The house itself is built and located in an urban zone. Od centra obce je vzdialený cca 2,50 km. Access to land and the house is directly from local roads, which is situated on the western side plot. Availability to the center is to 10 minutes. House is built on slightly sloping land, ktorý je oplotený. V blízkosti sú rodinné domy, Gardens, grassland, local stream, prístupová cesta, bus stop. The district town of the district institutions, Hospital and Polyclinic, celebration, secondary and primary schools, nursery, House of Culture, District Office, church, bus and train stop. In the village there are forests, lom, ongoing construction of highway. The family home is built: water connection, electrical connection NN, gas fixture, sewer connection.
The family house is a brick building, partial basement, with a gable roof. The house has two floors. The family house has one unit and has two inputs. One input is designed from the west side of the road (at the time of inspection is not used). The main entrance is designed from the courtyard on the south side. The connection between the floors is designed staircase, which is in the annexe of the east side of the building. The building is divided into basement, Ground and floor. The original building was built in 1965 and the basement and ground floor. In 1976 It was implemented extension stairs and floors with a roof extension.
In 2007 It was carried out reconstruction and modernization of the floor and started rebuilding and modernization of the ground floor, which at the date of inspection is not completed. In the basement there is one room used as a warehouse. On the ground floor there are rooms: entrance vestibule with, staircase, corridor, three Izby (two are in progress), boiler room, Fund, bathroom with WC (progress). On the first floor there are rooms: staircase, balcony, corridor, WC, bathroom, speiss, kitchen connected with living room, Two Izby. Attic space is connected with storey folding stairs.
Technical Solution:
Basics – 1. PP – concrete strips, Object isolated horizontal and vertical isolation insulation against water and soil moisture. Concrete Foundations is the basement part of the building and has a vertical isolation. Vertical load-bearing structures – 1. PP – concrete and walls lined in stone., 1. NP – built of bricks and blocks hr 400 until 500 mm; partition structures – priečkoviek of masonry and bricks, translations are reinforced concrete. Horizontal structures – floors above 1. PP a 2. NP are reinforced concrete, monolithic., ceiling above 1. NP is a wooden, joist with upper and lower knocks. Masonry is not a reinforcing ring of reinforced concrete. Three chimney stack are built from bricks. Roof – truss – truss structure is wooden saddle with collets, roof covering the truss is made of aluminum, sheet metal, which is the panicles; other plumbing roof structure is made of galvanized sheet metal with paint. They are conduits and leads, lee rail, chimney flashing, snow traps, exterior window sills on the windows are plastic. Edit the outer surfaces of the brisolite. Plinth is plastered. Internal surfaces – 1. NP a 2. NP. – lime plaster and painting., 2. NP – internal lining of ceramic tiles in the bathroom and WC, in the bathroom in the shower., a separate toilet, kitchen and a kitchen with stove and kitchen counter. Fillings – interior doors – 1. PP – Wooden, zvlakové, 1. NP – Door frame with filling in wooden frame, Entrance is massive. windows 1. NP a 2. NP – PVC windows with insulating glass replaced in 2007. Floor living rooms (okrem obytných kuchýň) – 1. NP laminate, large-floors only in one room, Other residential rooms are without floor (original floors were wood).Tile and flooring in other rooms – 1. PP – trampled earth, 1. NP – ceramic tiles in the hallway and entrance hallway. The boiler room is a concrete floor, in the bathroom, WC and warehouse floor is not. In 2. NP is on the corridor, in the bathroom, WC in the balcony and ceramic tiles, in living rooms and the kitchen is floating, laminated floor. On the stairs is laid linoleum. Bathroom amenities and a toilet on 1. NP there is no. Boiler equipment: stationary solid fuel boiler, which is a combination of domestic hot water for hot water. Kitchen Equipment – 2.NP – Electrical induction plate, electric oven, refrigerator and freezer (not incorporated), kuchynská linka z materiálov na báze dreva (8,00 m extended length), Sink sink stainless steel built-in kitchen counter, faucet, Lever, digester (of the year 2007). Vybavenie kúpeľne – shower, ceramic sink, faucet lever, 1 x-lever faucet with shower. Facilities separate toilet on 1. NP – flush toilet with cistern ( of the year 2017 ). Heating – central, hot water with distributions on each floor. Divorces are steel tubes, which are isolated. Heating units for 1. BS in one room, and the 2. NP are metal panel KORADO. Internal distribution of water – 1. NP a 2. NP – cold and hot water are fed to individual furnishings. Pipes are steel and plastic, hot and cold water are kept in floors and partitions; zdroj teplej vody – boiler central heating in a storage tank placed in the boiler room 1. NP (of the year 2007). Vnútorné rozvody kanalizácie – 1. NP a 2. NP – sewage wastewater from sanitary installations are done by gravity system. Waste plastic pipes are pressurized HDPE. Gas distribution are 1. NP in the boiler room – gas connection pipes and is down. Vnútorné rozvody elektroinštalácie – wiring (bez rozvádzačov) – 1. PP – light., 1. NP – electrical installation of the house is connected to the electrical connection through the electrical switchboard PR, which is placed on the wall at podstení. The electrical installation is carried AYKY type cables laid in the pipes of non-flammable. Installation components are mounted in an installation box. Outlets for lamps are finished in Terminal boards for lighting. A three-phase motor IP socket 44 It is connected by a cable CYKY – J 5×4 mm2 and is located in the entrance hallway. The electrical installation is divided into a light-motor. The light is divided into light and socket circuit and is located on 1. And the NP 2. NP; in 1. NP is only in one room, the boiler room and the hallway and stairs., elektrický rozvádzač – 1. NP – PR with automatic circuit breakers.
The original structure of the house since 1965, in 1976 It was realized superstructure and outbuilding. The original part and superstructure with additional building was in 2007 launched rebuilt and modernized, the date of inspection is implemented by the age of the individual building elements.
Calculation of the built-up area:
Storey | start taking | Calculation of the built-up area | ZP [m2] | kZP |
1. PP | 1965 | 1,2*(8,95*2,30) | 24,71 | 120/24,71=4,856 |
1. NP | 1965 | 13,30*10,00+4,85*3,00 | 147,55 | 120/147,55=0,813 |
2. NP | 1965 | 0 | 0 | |
2. NP | 1976 | 13,30*10,00+4,83*3,00 | 147,49 | |
TOGETHER: | 319,75 | 120/147,49=0,814 |
Accessories of products consisting mainly of auction:
Sklad to parc. No. 7230
Small building is located in a family house with. No. 392 CKN pozemku the parc. No. 7230/1. It is individually built and used by the family house. The layout is a single room, the attic are set up metal stairs.
Basics – bez podmurovky, only footings., Vertical load-bearing structures – of monolithic cinder block, without thermal insulation., Horizontal structures – ceilings – reinforced concrete., Staircase – metal., Roof – truss – saddle; krytina strechy na krove – plechová pozinkovaná; sheetmetal design – galvanized steel (my. trays, leads, prieniky)., Edit the external surfaces – thick lime plaster., The internal surfaces -vápenná rough plaster., Fillings – door – wooden zvlakové; windows – plastic with double glazing. Floors – thick concrete.
Plot od ulice
Plot is located in front of the family house of local roads. Separates the plot number 7230/1 the parcel, to which the public roads. On concrete strip foundation is a concrete Foundations, into which are fitted with steel posts. The uprights are fitted with a mesh fence parts. The height of the fence to 1,40 m. The fence are fence gate and fence gates. The part of the fence is provided with a coating. The fence was made in 1976, It is normally maintained. His life is for 50 years normal maintenance.
Plot of any streets
Plot is located on the eastern side of the property. Separates the plot number 7230/1 the parcel, to which the public roads. On concrete strip foundation is a concrete Foundations, into which are fitted with steel posts. The post is filling the machine with mesh. The height of the fence to 1,50 m. The fence are fence gate. The part of the fence is provided with a coating. The fence was made in 2007, It is normally maintained. His life is for 30 years normal maintenance.
Vodovodná prípojka
The family house is connected to public water tap connection. Water connection is built of steel tubes, isolated DN 32 x 2,0. The pipe is mounted in a groove of the dug into the sand bed. The backfill with gravel with compaction in layers. The minimum amount of coverage is 1200 mm. The calculation considered the length of the connection between the fence and the wall of the house from the street. It located on the property C CN parc. No. 7230/1. Dĺžka prípojky je 7,00 m. Connection was built in 1976. Normal maintenance is life 60 years.
Kanalizačná prípojka
Sewage pipeline is built as gravity pipes of PVC – DN 150 and running into sewer, located on local roads. The calculation considered the length of the connection between the fence and the wall of the house from the street. Dĺžka prípojky je 7,20 m. It located on the property C CN parc. No. 7230/1. The pipe is mounted in a groove of the dug into the sand bed. Will backfill with gravel with compaction in layers. The minimum amount of coverage 1000 mm. Normal maintenance is life 60 years. Connection is used since 1976.
Elektrická prípojka NN
Electrical connection NN is connected to the existing local grid airy SSE. The electrical network is 3PEN – 5usednom CKN land plot. No. 7231 aerial cable to the console, which is mounted on the wall of the house and on the wall in the ER getting divorced, located in cabinet, which is mounted on the outer wall of the house at the entrance. Length of electricity between the column and the bracket 13,10 m. Electrical connection has been implemented since 1976 and normal maintenance is for life 50 years.
Reinforced concrete surfaces
The concrete surface is on an access walkway from the street to the entrance to the house, to drain the pavement of streets around the perimeter of the house. On adjusted basis the concrete slab of concrete screed surface-treated. The concrete slab is divided dilatations. Hard surface was built in 1976. Normal maintenance is for life 60 years.
Stairs at the entrance to th
External stairs to the entrance to the house. On reinforced concrete slab is equipped with seven concrete steps, treads and risers have been modified ceramic tiles in 2007. In the calculation are added two degrees as a substitute for landing. Stairs were built in 1976. To normal maintenance service life of stairs is intended to 80 years.
Stairs from front yards on the ground floor rd
External steps are presented in front yards on ground floor of the family house. They are located on the western side of the house. They were built as part of the extension in 1976. On reinforced concrete slab is six concrete steps, including reinforced concrete platforms. Stairs were built in 1976. To normal maintenance service life of stairs is intended to 60 years.
Gas connection
In the calculation it is considered a part of the gas connection, which is the measurement and control cabinet, which is mounted at the fence from the street in a local street after transfer to a house in the place boiler. Length of connections in the calculation of the 16,50 m. The connection of steel tubes, tubes, steel, bezošve DN 25, They are isolated section, which they are stored in the crease. The pipe is mounted in a groove of the dug into the sand bed. Will backfill with gravel with compaction in layers. The minimum amount of coverage 800 mm. The greater part of the pipe is hung on the wall of a house. Normal maintenance is life 40 years. Connection is used since 1989. At the time of inspection gas connection is broken, meter is dismantled.
Land parcel register "C" No.:
Parcela | Type of property | share | Area [m2] |
7230/1 | built-up areas | 1/1 | 528,00 |
Total acreage: | 528,00 |
Pozemok C KN parcelné číslo 7230/1 is located in the city of Podzávoz, which is located in the district town of Trutnov. Čadca is located in the northern part of Kysuce region. Passing through the city traffic routes in Poland and in the Czech Republic. It is an important transport hub. City of River flows Kysuca. There are mountains and Javorníky Kysucké Beskydy. The city has 24 500 people. The current unemployment rate is up 10 %. The city is the county town of Zilina ca. 30 km. The plot is built house. The property is located in an urban zone. The approach is a general way, from the city center are about 2,50 km. Access to land and the house is directly from local roads, which is situated on the western side plot. Availability to the center is to 10 minutes. House is built on slightly sloping land, ktorý je oplotený. The city has completed the building of the necessary infrastructure and public facilities. The land and the family home is set up connections: water, electrical connection NN, gas fixture, Sewer. The city is located in the district of Žilina. Transportation to the district and county town is satisfactory. Doprava do centra mesta, The bus and train station and a bus passenger transport. In the city and surrounding area are objects of light industry. District is an established district institution, dôležitý dopravný uzol so železničnou zástavkou, autobusovou zástavkou, s mestskou a prímestskou dopravou, connection to the highway.